Lakefront Promenade Marina Docks and Fuel System Replacement

By June 15, 2021 No Comments

The first phase of the Project consists of removing and replacing existing piping, petroleum electrical, dispensers with sumps and hose reels from the floating docks and remove buried pipes and electrical for the fueling system from the existing underground tanks as well as replace the main dock and service dock. The second phase of the Project requires us to replace the underground tanks with newer ones, build a concrete pad above the tanks as well as replacing the secondary dock.

Owner – City of Mississauga

Consultant – Shoreplan Engineering Limited