Project Description

Pre-Engineered building with five (5) bay maintenance shop including offices, mezzanine storage at one end, a three ton crane and two hoists. Construction also included a dry storage building with a 3.6m high concrete base, wood framing and metal siding and roof to provide closure for salt and sand storage as well as an above ground fueling station complete with concrete pad.