Thomas A. Stewart Secondary School – Field Conversion

This project for the City of Peterborough involved a field conversion from a natural turf field to a FIFA 1 Star artificial turf multi-sport field, 6 lane rubberized running track and long jump/triple jump/steeple chase/high jump/pole vault/shot put/discus/hammer toss facility. Construction activities performed included extensive excavations and site grading, installation of extensive sub-drainage, site servicing […]

By |February 27th, 2015|Uncategorised|Comments Off on Thomas A. Stewart Secondary School – Field Conversion

Lake Wilcox Park – Waterfront Promenade

This award-winning project for the Town of Richmond Hill involved the conversion of a beachfront roadway into a pedestrian promenade creating a significant lakefront attraction for residents from around the Greater Toronto Area. The site features an outdoor classroom that extends across marshland to a raised boardwalk, to a peninsula with armourstone seat walls, stainless […]

By |February 27th, 2015|Uncategorised|Comments Off on Lake Wilcox Park – Waterfront Promenade

Holcim Waterfront Estate Redevelopment

The Holcim Waterfront Estate, formerly known as the “Bell Gairdner Estate” or Ontario Hydro’s “Fusion Fuels Technology Centre”, is located on a 44 acre lakefront property at the south-western corner of the City of Mississauga. The property extends from Lakeshore Road, south to the outlet of Joshua Creek and the Lake Ontario shoreline. Built in […]

By |February 27th, 2015|Uncategorised|Comments Off on Holcim Waterfront Estate Redevelopment

Geo. A. Kelson – Core and Shell Renovation & Expansion

The construction of the new offices and manufacturing plant for Geo. A. Kelson consisted of two phases. The first phase consisted of the demolition of an existing building complete with footings and foundations, excavation, new concrete footings and foundations, new concrete stair towers, backfilling and new site services. The second phase included structural steel, slab […]

By |February 27th, 2015|Uncategorised|Comments Off on Geo. A. Kelson – Core and Shell Renovation & Expansion

Seneca College – Various Projects at Newnham, Markham and York Campuses

Seneca Newnham
The projects completed at the Seneca College Newnham Campus included a renovation of their building ‘D’, cafeteria & corridor, chemistry lab, renovation of Senecentre, renovation of a dance studio, and renovation of their International Student Services area.
Seneca Markham
Work carried out at Seneca College Markham Campus included an extensive transformation & upgrade to their 3rd, […]

By |February 26th, 2015|Uncategorised|Comments Off on Seneca College – Various Projects at Newnham, Markham and York Campuses

North York General Hospital

Over the course of several years, Rutherford Contracting Ltd. has performed various projects at the North York General Hospitals. The work was all carried-out in occupied spaces and healthcare regulations had to be followed for public safety. Projects performed at North York General Hospital included interior renovations to Cardiorespiratory and Speech & Hearing Department, renovations […]

By |February 26th, 2015|Uncategorised|Comments Off on North York General Hospital

Durham Catholic District School Board – Interior Renovation for Conference Centre

This project for the Durham Catholic District School Board involved the conversion of an existing warehouse/storage area to a conference facility that features new washrooms, warm-up kitchen, foyer, storage room, AV room, stage platform and offices. Scope items included demolition of existing interior partitions/finishes, door infills, structural steel reinforcement for new mechanical unit, steel stud, […]

By |February 26th, 2015|Uncategorised|Comments Off on Durham Catholic District School Board – Interior Renovation for Conference Centre

Barrie Courthouse Complex – Exterior Stairwell Replacement

This project for the Ontario Infrastructure and Lands Corporation (Infrastructure Ontario) involved an exterior stairwell replacement at the Barrie Courthouse Complex. Scope items included demolition of existing stairs & landings, public safety hoarding protection, new concrete foundation walls, new concrete stair and landings, slotted drainage system at middle landing area, new masonry copings and stucco […]

By |February 26th, 2015|Uncategorised|Comments Off on Barrie Courthouse Complex – Exterior Stairwell Replacement

Aurora GO Station Restoration

Due to this building’s historical significance, GO Transit decided to restore the old Aurora railway station to its turn-of-the-century appearance. This track-side historical restoration project involved the temporary relocation of the structure in order to construct a new concrete foundation due to the original wood post foundation no longer being suitable to withstand the mass […]

By |February 26th, 2015|Uncategorised|Comments Off on Aurora GO Station Restoration

Lyon's Log Cabin Relocation & Restoration

This historical project involved the relocation and restoration of a settler’s cabin, originally built c. 1820’s. Construction activities performed included temporary stabilization of existing structure, relocation of the structure via crane and transport truck, the construction of a new floating slab on grade concrete foundation, new rubble stone foundation walls, chimney & fireplace, the replacement […]

By |February 25th, 2015|Uncategorised|Comments Off on Lyon's Log Cabin Relocation & Restoration